The report presents the analysis that was utilized to determine the state’s preferred site for locating a support facility for the Green Line extensions. It includes details about the project’s requirements and a breakdown of how the State’s consultant VHB evaluated the alternative sites, and ultimately recommends exactly the same option the State initially favored: Yard 8. (See STEP’s interactive map.) As stated previously, STEP and others have serious concerns about this recommendation.
Download the report (PDF)