Somerville’s Community Path would be a critical link between Boston and existing paths to the west. Currently, the State is planning only to design the Path from Lowell St. to Inner Belt as part of the Green Line extension. We believe the Path should be designed all the way to Lechmere and built along with the Green Line construction.